BFT P125002

BFT SB-BAT P125002 24V DC Batareya Ehtiyat Dəsti Təlimat Təlimatı

For BFT Gate Opener Systems

1. Giriş

This manual provides essential instructions for the installation, operation, and maintenance of the BFT SB-BAT P125002 24V DC Battery Backup Kit. This kit is designed to ensure continuous operation of compatible BFT gate openers during temporary power outages. Please read this manual thoroughly before proceeding with installation or use.

2. Məhsul bitdiview

The BFT SB-BAT P125002 is a 24V DC battery backup system that integrates with specific BFT gate operators. It includes a smart charger board that manages battery charging when main power is available and automatically switches to battery power when the main supply is interrupted.

BFT SB-BAT P125002 Battery Backup Kit components in box

Şəkil 1: bitdiview of the BFT SB-BAT P125002 Battery Backup Kit, showing the product box, two batteries, wiring, and mounting hardware.

2.1. Kit Komponentləri

Individual components of the BFT SB-BAT P125002 Battery Backup Kit

Şəkil 2: Ətraflı view of the BFT SB-BAT P125002 kit components, including batteries, wiring, mounting brackets, and the battery holder.

3. Uyğunluq

This battery backup system is compatible with the following BFT gate operator series:

Ensure your gate operator model is listed above for proper functionality.

4. Quraşdırma və Quraşdırma

Installation of the BFT SB-BAT P125002 kit is designed to be straightforward. However, it is recommended that installation be performed by a qualified technician to ensure safety and correct operation. Always disconnect main power to the gate operator before beginning installation.

4.1. Təhlükəsizlik tədbirləri

4.2. Quraşdırma Addımları (Ümumi Təlimatlar)

  1. Mount the Battery Holder: Secure the battery holder/mounting base within the gate operator's control box or an appropriate enclosure using the provided mounting brackets and fasteners. Ensure it is stable and accessible.
  2. Batareyalar daxil edin: Place the two 12V 1.2Ah batteries into the battery holder.
  3. Batareyaları birləşdirin: Connect the batteries in series to achieve 24V DC, following the wiring diagram provided with your specific gate operator or the kit's smart charger board. Ensure correct polarity.
  4. Connect Smart Charger Board: Integrate the smart charger board into the gate operator's control unit. Refer to your gate operator's manual for the specific connection points for the battery backup system.
  5. Təhlükəsiz naqil: Route and secure all wiring to prevent pinching or damage.
  6. Gücü bərpa edin: Once all connections are verified and secure, restore main power to the gate operator. The smart charger board will begin charging the batteries.
  7. Test Sistemi: Perform a power outage simulation to verify the battery backup system activates correctly and powers the gate operator.

5. Əməliyyat Təlimatları

The BFT SB-BAT P125002 operates automatically once installed correctly.

5.1. Normal Operation (Power On)

When main power is supplied to the gate operator, the smart charger board within the SB-BAT kit continuously monitors the battery charge level. It will charge the batteries as needed to maintain them at full capacity.

5.2. Güctage Operation (Power Off)

Bir güc halında utage, the smart charger board automatically detects the loss of main power and switches the gate operator to battery power. The gate operator will then function normally using the stored energy in the batteries. The duration of operation on battery power depends on the frequency of gate usage and the charge level of the batteries.

6. Baxım

Regular maintenance ensures the longevity and reliability of your battery backup system.

6.1. Battery Recharging

Bir güc u sonratage, once main power is restored, the smart charger board will automatically begin recharging the batteries. A full recharge typically takes 12 ilə 14 saat arasında. It is important to allow sufficient time for batteries to fully recharge after use.

6.2. Fuse Check

Sistemə daxildir a 20A qoruyucu for protection. If the battery backup system fails to operate or charge, inspect the fuse for continuity. Replace with a fuse of the exact same rating if necessary. Always disconnect power before checking or replacing fuses.

6.3. Battery Life and Replacement

Batteries have a finite lifespan. Periodically test the system by simulating a power outage to ensure batteries hold a charge and can power the gate operator. If performance degrades significantly, consider replacing the batteries. Use only recommended replacement batteries (2x 12V 1.2Ah sealed lead-acid).

7. Giderme

If your BFT SB-BAT P125002 battery backup system is not functioning as expected, consider the following:

For persistent issues, contact BFT technical support or a qualified service technician.

8. Spesifikasiyalar

XüsusiyyətSpesifikasiya
Model nömrəsiP125002
Batareya növüMöhürlənmiş qurğuşun turşusu
Batareya Tutumu2x (12V 1.2Ah)
Çıxış həcmitage24V DC (nominal)
Şarj Voltage27.2V
Doldurma cərəyanı130mA
Batareyanın doldurulma vaxtı12-14 saat
Exhausted Battery Protection Threshold20.4V
Sığorta reytinqi20A
İşləmə temperaturuData detected with external temperature of: 25°C (77°F)

9. Zəmanət və Dəstək

For warranty information, please refer to the documentation provided with your original purchase or contact BFT customer support directly. For technical assistance, installation queries, or troubleshooting beyond the scope of this manual, please contact your authorized BFT dealer or BFT technical support.

BFT Contact Information: Please visit the official BFT webən aktual əlaqə məlumatları və dəstək resursları üçün sayt.

Əlaqədar Sənədlər - P125002

Preview BFT DEIMOS BT UL/CSA Electromechanical Gate Automation System
Discover the BFT DEIMOS BT UL/CSA, an electromechanical automation system for rack sliding gates. Featuring smart technology, 24V safe operation, and simplified installation, this system enhances gate security and convenience. Explore its technical specifications and available accessories for residential and commercial applications.
Preview BFT Mitto 2M/4M Uzaqdan Kodlaşdırma Təlimatları: Hərtərəfli Bələdçi
Qaraj və qapı açarları üçün BFT Mitto 2M və 4M pultlarınızı necə proqramlaşdırmağı öyrənin. Bu təlimat rəqəmsal ekranlı və ya ekransız qəbuledicilər üçün kodlaşdırmanı, o cümlədən mühüm təhlükəsizlik xəbərdarlıqlarını əhatə edir.
Preview BFT VIRGO Swing Gate Automation Installation Manual
Comprehensive installation and user guide for the BFT VIRGO swing gate automation system, covering safety, technical specifications, installation procedures, programming, and maintenance.
Preview BFT Cell Switch Prime GSM Gate Opener - Installation & User Manual
Detailed installation and user manual for the BFT Cell Switch Prime, a GSM cellular gate opener and alarm signalling device. Covers system overview, installation, programming via app and SMS, features, troubleshooting, and parameter lists.
Preview Quraşdırma təlimatı və Uso BFT GIOTTO 30-60 S BT / GIOTTO 30-60 BT
BFT GIOTTO 30-60 S BT və GIOTTO 30-60 BT üçün avtomatik quraşdırma və istifadə üçün tam təlimat. Xüsusi texnika, konfiqurasiya və manutenzion daxil edin.
Preview BFT MITTO 2B Uzaqdan Kodlaşdırma Təlimatları | Retro Pult
Mövcud pult və qəbuledici LCD ekran üsullarını əhatə edən qapı açıcıları üçün BFT MITTO 2B pultlarının kodlaşdırılması üçün addım-addım təlimat. Problemlərin aradan qaldırılması üçün göstərişlər daxildir.